The Kelvin is one of Belfast's newest office developments. Occupying an ideal city centre location in College Square East, connectivity is at the centre of this new office hub.
Commissioned by GRAHAM, these images are being used to highlight their ‘people at work’ ethos and their comprehensive graduate scheme within the company. They were shot onsite in Belfast ...
Braidside Integrated was opened in 2020. It was designed by Isherwood & Ellis Architects.
Commissioned by Doherty Architects, this new community centre was opened in the summer of 2020 in Derry / L’Derry, N Ireland.
Brand new office refurb in Drumcondra, Dublin. Commissioned by Calibro.
Commissioned by Doherty Architects, The Cyber Building was completed early 2020 in Weavers Court, Belfast. It features the original weaving machine from the 1900’s.
A while ago I was asked to shoot some test images for Kris Turnbull studios. The space is a bespoke, converted church in the heart of Belfast.
Commissioned in Dec ’19 Calibro needed some new content for their website and publications. These two projects were based in Drumcondra, Dublin and the new Antrim Enterprise Park.
Commissioned by Consarc, this project comprised of four main elements; new build visitor centre, refurbishment of stable yard building, garden restoration, and restoration of the main castle.
I’ve had some great gigs with Graham Construction this year. They have a big portfolio in London, so it was a pleasure to be asked to shoot the refurbishment of the Kathleen Lonsdale Building. The KLB ...